myHanse.com - Hanse Yacht Owners Website myHanse.com - Hanse Yacht Owners Website myHanse.com - Hanse Yacht Owners Website myHanse.com - Hanse Yacht Owners Website

Welcome to myHanse.com the forum for Hanse Yachts owners throughout the world.

Forum Home Forum Home > Hints & Tips > 630
  New Posts New Posts RSS Feed - Hanse 630e lead time
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Hanse 630e lead time

 Post Reply Post Reply
Author
Message
oceanbluesail09 View Drop Down
Lieutenant
Lieutenant
Avatar

Joined: 18 July 2008
Status: Offline
Points: 24
Post Options Post Options   Thanks (0) Thanks(0)   Quote oceanbluesail09 Quote  Post ReplyReply Direct Link To This Post Topic: Hanse 630e lead time
    Posted: 19 July 2008 at 22:55
Hi, I was wondering what the production lead time for the Hanse 630 is? Are the deliveries usually on time? Ive heard stories about other boat manufacturers where the delivery is usually 2-3 months late..

seriously looking at the hanse 630 for a circumnavigation. will you guys posted on the progress,

:)

Back to Top
Yeoman View Drop Down
Admin Group
Admin Group


Joined: 31 May 2007
Location: Hamble
Status: Offline
Points: 384
Post Options Post Options   Thanks (0) Thanks(0)   Quote Yeoman Quote  Post ReplyReply Direct Link To This Post Posted: 29 July 2008 at 09:19
Hi Ocean Blue,
 
The last time I checked (a week ago) the factory have just got their new production facility online, which is specifically for building the 630e.  There is a build slot for November completion.
 
We have never had any more than a delay of a couple of weeks, which was due to something out of the factorys control.
 
Kind regards
 
Phil
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.06
Copyright ©2001-2023 Web Wiz Ltd.

This page was generated in 0.109 seconds.

Links : www.hanseyachts.co.uk www.hanseyachts.com www.fjordboats.co.uk www.dehler.co.uk www.varianta.co.uk